↳ The constraint
Shopping-centre access route
↳ The outcome
The machine reached the work area through the planned internal route.
The job started with the access route. The machine had to reach the work area without damaging the building or stopping the centre around it.
The Bluelift SA26 gave us the working height and the setup options needed once we were inside. The route and setup were planned before the machine arrived.
